A ribbon-cutting ceremony was held at Saint Margaret Residential Centre to celebrate recently completed construction projects at the site. Vivian Magini, Chief of Material Installations, said, “All of these projects are carried out to improve the residents’ quality of life.”
• Garden enlarged and restructured to make it more ergonomic and accessible to residents
• New lawn furniture placed in the garden
• Gazebo painted
• Ventilation system installed in the west wing on the second to fourth floors
• Ceilings completed and LED lighting installed mimicking daylight with dimmers
• Wall sconces replaced (10 per floor)
• Hallways repainted in the east, west and north wings
• Refrigerator and counter installed in the dining area
• Compressor units replaced on rooftop, serving kitchen and east wing
• AC added in elevators
• Day Centre to have two AC units and ventilation replaced
Other projects to improve the living environment at Saint Margaret are in the plans for the future. “We want to make a difference in the living environment for our residents. After all, this is their home,” says Ms. Magini.